banner
Unternehmens Nachrichten
Factory Assembly Test Completed – GT4 Double Post ZAM Steel Ground Mount 2026-10-10

Factory Assembly Test Completed – GT4 Double Post ZAM Steel for 1.4kN/m² Snow & 30m/s Wind

Another successful pre-shipment test at HQ Mount!

We just completed a full factory assembly test for a GT4 double post ground mounting system – ZAM coating steel, engineered for 1.4 kN/m² snow load and 30 m/s wind speed.

Project Specifications:

✅ System: GT4 Double Post Ground Mount

✅ Material: ZAM Coating Steel

✅ Profile: C160 with 3mm thickness – engineered for the load

✅ Design Loads: 1.4 kN/m² snow | 30 m/s wind

✅ Panel Layout: 2 panels portrait

✅ Panel Type: Bifacial

✅ Ground Clearance: 1m – optimized for bifacial gain

Why we test before shipping:

✔️ Verify every component fits perfectly

✔️ Confirm structural alignment and integrity

✔️ Eliminate on-site surprises

✔️ Ensure fast, trouble-free installation

⚡ Production Capacity: Over 80MW/month | Strict QC at every step

HQ Mount – Direct Manufacturer Since 2008 | 15,000m² Factory | 50GW+ Supplied






hinterlass eine Nachricht

Wenn Sie an unseren Produkten interessiert sind und weitere Einzelheiten erfahren möchten, hinterlassen Sie bitte hier eine Nachricht. Wir werden Ihnen so schnell wie möglich antworten.

Startseite

Produkte

Unternehmen

Kontakt